Solomon Islands. Health Care Waste Management Study, Ministry of Health Facilities on Guadalcanal and Makira, Phase I, Rapid Situation Assessment with Recommendations and Estimated Costs. This study was undertaken as a step to minimize potential adverse human health and environmental impacts of waste generated by MoH facilities, specifically the existing hospital at Kirakira on the island of Makira, and to recommend actions to establish an environmentally sustainable health care waste management system. Inspection of solid waste management, health care waste management, water supply and wastewater treatment systems, with recommendations and estimated costs for interventions.
Indonesia. Conduct a Strategic Environmental Screening Assessment for the preparation of the Southeast Java Regional Development Project, toimprove analytical underpinning of development planning and environmental impact assessment processes through early identification of issues and assessment of risks. Visit the project site to: review project preparation documentation; consult with the project preparation team in order to gain familiarity with the various direct investments as well as the potential indirect (induced) development; conduct preliminary consultations with principal stakeholders; review the existing land use planning and institutional framework for implementing and enforcing the land use plan. World Bank, 2004 - ongoing.
Prototype Carbon Fund (PCF). Evaluation of applications for Prototype Carbon Fund, emissions estimates and CO2 equivalents according to internationally recognized estimation guidelines, Environmental Impact Assessment and Environmental Management Plan review. Gansu Clean Energy and others World Bank, 2004 – ongoing.
Viet Nam. Team Leader, Independent Environmental Monitoring Team, Mekong Transport and Flood Protection Project, a World Bank funded project to renovate and increase capacity of highways in central and south Viet Nam. The Mekong sections comprise over 100 km of roadway, almost all of which is adjacent to aquaculture or surface water. The Mekong sections traverse potentially acid active plastic clays, presenting unique environmental management challenges. Update Environmental Impact Assessment, redraft environmental monitoring plans in order to cover a far greater area of impact than the old EIA had anticipated, including the special issues related to acid soils in the Mekong delta. Monitoring plans make use of multi-parameter instrumentation for water sampling, and are now well within the estimated budgets. Ongoing activities will include environmental inspections of the project sites, and assistance to MOT as special issues arise. Montgomery Watson Harza Engineers, 2003 - ongoing.
Viet Nam. The Road Network Improvement Project (RNIP) comprises hundreds of kilometers of road rehabilitation throughout north, central and south Viet Nam. Review of EIA and preparation of loan appraisal documents. Site surveys and implementation supervision. World Bank, 2003 - ongoing.
Kingdom of Tonga. Health Sector Management Project, includes technical assistance in health sector management as well as infrastructure renovation. Technical assistance and training in health care waste management throughout the MOH, acquisition of vehicles, treatment systems and personnel protective equipment for sustainable health care waste management. Project preparation and supervision, health care waste management feasibility study, asbestos survey, EIA terms of reference, health care waste management policy consulting, site surveys, environmental and human health risk analysis, evaluation of wastewater treatment system and recommendations for replacement system, health care waste treatment technology, health care waste management practices consulting. World Bank, 2003 - ongoing.
Western Samoa. World Bank Health Sector Management Project, includes technical assistance in health care management and infrastructure rehabilitation, including acquisition of health care waste transport vehicles, personnel protective equipment, new waste treatment facilities, renovation of existing waste treatment facilities, and renovation of the wastewater treatment plant for the principal hospital. Environmental aspects of project preparation and supervision, including personnel consultations, site surveys, evaluation of environmental impacts and risks, asbestos survey, health care waste management, air emissions mitigation and wastewater treatment rehabilitation consulting. World Bank, 2003 - ongoing.
Inter-American Development Bank. Development of project environmental management tools for 11 energy and infrastructure sectors: water supply and sanitation; thermal power; roads and highways; airports; ports and harbors; pipelines; electrical distribution systems; telecommunications; electrical transmission lines; hydropower; railways. Sector-specific environmental management tools included: format for environmental and social compliance reports; environmental and social project monitoring plans; environmental and social performance indicators; outlines of environmental issues; and checklists for monitoring/supervision site visits.
Thailand. Management of Thai electricity utility (EGAT) successful loan application to meet the World Bank requirements for environmental issues. Issues included institutional restructuring and privatization, with nine environmental impact assessments for over 7,000 MW of power generation and five transmission system projects, over $5 billion dollars of investments. Prepared all summary reports for World Bank Board of Directors. EGAT, Thailand, June 1998-2001.
Mongolia. Energy Sector Support Project, assessment and management report on environmental issues related to asbestos removal in district heating system, radio activity and mine water discharge in coal mine, and EMF and safety clearances for power transmission. Summary report to World Bank Board of Directors. World Bank, East Asia Energy, March 1999.
Vietnam. Technical Advisor, Dai Ninh River Basin Management Plan, development of an integrated watershed management and rural development plan, as follow up for the Environmental Impact Assessment of the Dai Ninh hydroelectric project. The plan is a dynamic computer simulation that will estimate the impacts of various land use and agricultural practices in any given area on the life span of the hydropower reservoir. Power Investigation and Design Company 2 (PIDC2), 1997-1999.
India: National Thermal Power Corporation (13,000 MW) Generation Project, a $5 billion timeslice investment program: Management and project development tasks included scheduling, assessment of corporate environmental management & organization; inspection and environmental audit of existing power stations; review of safety and environmental management at power stations; development of corporate and power station Environmental Action Plans; development of institutional strengthening terms of reference; review of Environmental Impact Assessments for new projects; Staff Appraisal Report Sections to World Bank Board of Directors; supervision of project implementation and reports to management, World Bank, 1993-1998.
Nepal. Initiate project to promote private investment in Nepal hydropower projects, management recommendations included an inception report on requirements to make private investment in hydropower more attractive, including needs for institutional changes, baseline information to be made available, project environmental and social impacts screening, using GIS, aerial and landsat photography, production of thematic maps, U.S. AID, August, 1998.
Thailand. Manage the development of the Electricity Generating Authority of Thailand (EGAT) Environmental Analysis to meet World Bank standards of a 500 KV transmission system for IPP’s that runs the length of the country. Summary report to World Bank Board of Directors. World Bank, 1997.
Vietnam. Manage the development of Power Investigation and Design Company 1 (PIDC1) Environmental Analysis of 500 KV transmission system to World Bank standards. The transmission system runs the length of the country. Summary report to World Bank Board of Directors. World Bank, 1997.
India. Draft terms of reference for Technical Assistance to Develop a National Strategy for Clean Up of Hazardous Waste Dumps, World Bank, 1997.
India. Haryana State Power Restructuring Project. Management and project development tasks included field inspections of power plants; review of corporate environmental management and compliance; environmental project scoping; environmental action plans for rehabilitation of existing power stations; terms of reference for institutional strengthening of environmental management in the generation company; terms of reference for institutional strengthening of environmental management in the transmission and distribution companies; PCB management technical assistance terms of reference; terms of reference for environmental impact assessment; generated environmental impact assessment of the power transmission projects. Reports to World Bank management. World Bank, 1996-1997.
India. National Thermal Power Company, Talcher Thermal Power (1,000 MW) Project, missions and follow up included inspection of facilities for environmental and health and safety issues, assistance in implementation of Environmental Action Plan, assessment of environmental management structure and performance, assessment of progress in environmental monitoring program and compliance with regulatory standards, review of facility environmental monitoring and other documentation, review of safety management organization, disaster contingency plans and risk assessment, general progress in construction activities, environmental project monitoring with project management software. Reports to World Bank management and summaries for World Bank Board of Directors. World Bank, 1993 through 1997.
India. Bombay Suburban Electric Supply, 500 MW (BSES). Management tasks included assessment of environmental management structure and performance; assessment of progress in environmental monitoring program and compliance with regulatory standards; review of facility environmental monitoring and other documentation; review of safety management organization; disaster contingency plans and risk assessment, general progress in construction activities; report of findings; environmental project monitoring with project management software, Environmental Impact Assessment review; consulting on establishment of chlorine discharge standards; implementation supervision, mid term review, implementation completion report for the World Bank Board of Directors. World Bank, 1993-1997.
Thailand. Clean Fuels Project, Bangchak Refinery. Oil refinery inspection and formulation of environmental action plan, assistance in Environmental Impact Assessment preparation, Staff Appraisal Report environment sections for World Bank Board of Directors, supervision of implementation and reports to management World Bank, 1994-1996.
Indonesia. Review and comment, Initial Environmental Assessment of Geothermal Power Projects, Second Rural electrification Project, World Bank, 1996.
India. State Power Sector Restructuring (privatization) Projects: Rajasthan, Bihar. Power station site inspections, management interviews at corporate headquarters of State Electricity Boards and Ministry of Energy, inspection and development of environmental action plans for existing power stations, project scoping and preparation, documentation with respect to environmental issues, Government of India and World Bank requirements, development of terms of reference for Environmental Impact Assessment studies, terms of reference for institutional strengthening for environmental management in the power generation and transmission and distribution entities, environmental analyses for planning transmission lines. Review of Environmental Impact Assessment Studies. World Bank, 1996.
China. Technical assistance in development of Environmental Impact Assessment study to meet World Bank standards, Inner Mongolia Touketuo power station (1200 MW), with North China Electric Power Design Institute, Beijing, for Touketuo Preparatory Department, Inner Mongolia, China, project summary for the World Bank Board of Directors, 1996.
World Bank. Environmental Standards Compendium: Compiled environmental standards for air quality, emissions, water quality and effluent for Asian and selected industrialized countries, for internal publication, World Bank, 1993, updates '94, '95 and '96.
World Bank. Comparison of IFC and World Bank Environmental Assessment and Clearance Procedures, internal document for management review, ASTEN and CTEED, 1996.
World Bank. Development of a field survey based checklist of environmental issues, fossil fuel power plants, including photographic documentation, and a checklist for environmental impact assessment review, for in-house training and publication, World Bank, 1995-1996.
India. Coal India, Coal Sector Rehabilitation Project, development of Environmental Action Plan for 35 mines of Coal India, including environmental project specifications and computerized project management tracking, development of terms of reference for institutional strengthening of Coal India environmental management organization, development of terms of reference for institutional strengthening of State Pollution Control Boards, World Bank, 1994-1996.
India. Renewable Resources Development Project (baggase paper mill), Kerala Power Project, Power Utilities Efficiency Improvement Project, and Oil and Natural Gas Company (ONGC) India, Field inspections and implementation supervision, environmental management assessments, delineation of environmental aspects of World Bank investments, World Bank, 1993-1995.
Outer Mongolia. Coal Sector Rehabilitation Project, Baga Nuur Coal Company, environmental project scoping, field survey and development of environmental impact analysis as "b" category project for the World Bank Board of Directors, World Bank, 1995.
India. Orissa State Electricity Board Restructuring Project. Integrated rural development and watershed management plan for the Upper Indravati hydroelectric project for Staff Appraisal Report; field inspection of hydropower development site; review of hydropower Environmental Impact Assessment; environmental project scoping; institutional strengthening terms of reference for power generation and distribution companies; environmental impact assessment for power transmission line projects. Project summary for World Bank Board of Directors, World Bank, 1994-1995.
Vietnam. Dai Ninh Hydropower (300 MW) Project, Scientific Advisor for environmental impact assessment, development of Terms of Reference for Technical Assistance in Environmental Management (integrated watershed management) for the Power Investigation and Design Company #2, C. Lotti and Associati, Rome, Italy, 1995.
Indonesia. Summary of environmental regulations and legislation for Staff Appraisal Report to the World Bank Board of Directors, World Bank, Asia Technical Environment Division, May 1995.
Indonesia. Renewable Energy Project, palm oil waste process technology review, World Bank, May 1995.
Pakistan. Environmental Impact Assessment reviews, Hab River, Uch Power, Fauji Electric, reviews included evaluation of impacts of thermal and chlorine discharges on near shore habitat, including coral reefs, World Bank, May 1995.
Cambodia. Phnom Phen Power, PCB disposal environmental safety and health guidance, World Bank, May 1995.
India. Tata Electric Companies, Trombay and National Thermal Power Company, Talcher Thermal Power (1,000 MW) Project, missions and follow up include inspection of facilities for environmental and health and safety issues, assessment of environmental management structure and performance, assessment of progress in environmental monitoring program and compliance with regulatory standards, review of facility environmental monitoring and other documentation, review of safety management organization, disaster contingency plans and risk assessment, general progress in construction activities, report of findings, environmental project monitoring with project management software, World Bank, 1993 through 1995.
Asia. Develop terms of reference for PCB disposal and best management practices study, Asia electrical power and transmission projects, World Bank, 1994.
Nepal. Terms of Reference, Study of Alternative Energy Schemes to Replace Fuelwood Usage In High Environmental Impact Areas of Nepal, World Bank, 1994.
Indonesia. Review of rapid Environmental Impact Assessment methodology and individual assessments, Indonesia Outer Islands Power Project, World Bank, 1994.
Asia. develop standards for practices for thermal power plant ash pond management, Terms of Reference for supervision study, World Bank, 1994.
China. Environmental Impact Assessment review, environmental annexes for staff appraisal report, Zhejiang Power (2,000 MW) Project, Zhejiang Multicities Project (urban development, water supply and wastewater treatment) World Bank, 1994.
India. Groundwater monitoring report review, Second Maharastra Power Project, World Bank, 1994.
Bangladesh. LPG Transport and Distribution Restructuring Project, corporate meetings, field visits and environmental status report, draft terms of reference for further environmental studies, World Bank, Asia Energy Division, 1994.
Bangladesh. Petrobangla Gas Infrastructure Environmental Impact Assessment review, World Bank, 1994.
India. Uttar Pradesh State Power Restructuring Project. Field inspections of power plants; review of corporate environmental management and compliance; environmental project scoping; environmental action plan for rehabilitation of existing power stations; terms of reference for institutional strengthening of environmental management in the generation company; terms of reference for institutional strengthening of environmental management in the generation and distribution companies; PCB management TOR; terms of reference for environmental impact assessment for rehabilitation of power stations. World Bank, 1994.
People's Republic of China. National Environmental Action Plan, working with the National Environmental Protection Agency of China, helped finalize the Action Plan 2000 for submission to the World Bank, China National Environmental Protection Agency (NEPA), 1993.
People's Republic of China. Development of terms of reference for China Fertilizer Industry Restructuring Project, Overall Technical Assistance and Institutional Strengthening Program: 1) Development of an Environmental Monitoring and Data Communications Program; 2) Development of and Environmental/GIS Database for the Sector; 3) Fertilizer Application Environmental Impact Study; 4) Fertilizer Transport and Storage; 5) Development of Fertilizer Production Facility Environmental Audit Program; 6) Strengthening of the Ministry of Chemical Industry Environmental Unit, and the Environmental Protection Research Institute; 7) Creation of an Environmental Assessment Review and Environmental Project Support Unit. World Bank, 1993.
India: Power Finance Corporation (a World Bank funded lending institution): field surveys of power stations and development of site assessment methodology, environmental action plan development, industrial best environmental practices, institutional strengthening. World Bank, 1993.
Asia. Presentation of detailed environmental project and institutional development planning and monitoring, using computer software tools, World Bank, 1993.
Philippines. Environmental Sector Study, review and comment, World Bank, 1993.
India. Environmental impact assessment reviews, Coal India projects, World Bank, 1993.
Thailand. Offshore gas development project environmental impact assessment review, World Bank, 1993.
People's Republic of China. Development of Environmental Action Plan and other project development documentation, Sichuan Gas project, World Bank, 1993.
India. Environmental Impact Assessment and Disaster Contingency Plan review, project implementation supervision, Tamil Nadu Newsprint and Papers, World Bank, 1992-1996.
Prepared Environmental Assessment Summary, Zhejaing Multi-Cities Infrastructure Project, preparation of Environmental Summary and Environmental Action Plan for Staff Appraisal Report (SAR) (World Bank, ASTEN), February 1992.
Development of Environmental Strategy Annex, Southern Jiangsu Environmental Project, 1992
Expert witness and technical assistance:
- Expert witness and site investigation: follow on to previous property transfer site contamination assessment, briefings for law firm representing industrial concern in litigation with the State. Private client and Gordon, Fienblatt, Rothman, Hoffberger & Hollander, 1996.
- Expert witness in litigation concerning responsible parties for industrial site clean up, with reference to environmental impairment liability insurance survey of site. Goodwin, Proctor & Hoar, Washington, D.C.; Foley Hoag & Elliot, Boston, MA, 1995.
- Expert witness evaluation of negligence in storage and handling of hazardous materials, and subsequent spill response, gasoline leakage and explosions in residential area, Baltimore, Maryland, David Kuryk, attorney, 1988.
- Technical assistance under US EPA "TAG" grant program, concerning Star Oil spill site investigation and clean up, Fairfax, Virginia, Mantua Citizens Association and US EPA, 1995-1996.
- Technical assistance in evaluation of environmental and human health impacts of Gulf War within Iraq, including planning, in-country field surveys, sample and data collection and report. United Nations, Oxfam UK, and others, 1991.
- Technical assistance in chemical weapons disposal technologies, US Senate Office of Technology Assessment, 1988-1990.
Wetlands and coastal zone issues:
- Wetland delineation field surveys and mapping: using U. S. Army Corps of Engineers delineation criteria, soils, hydrology, and botany, developed training programs for surveyors, Techlaw Inc. Chantilly, VA, and engineering firms and private developers, 1991-1992.
- Potential Environmental Impacts of Offshore Oil Exploration and Development, paper for the International Marine Fisheries Conference, Athens, Greece, 1991
Mining Environmental Issues, and Mined Land Reclamation Planning:
- Designed runoff water pollution mitigation system using natural land forms and forested wetlands for a waste clay impoundment abandonment project and supervised construction (Borden, Inc.)
- Detailed reclamation designs for waste clay settling area, including earthwork cost estimation and wetlands reclamation design (Borden, Inc.)
- Performed computer simulation of an earth dam breakage and other earth dam failure analyses for large waste clay settling impoundment (MCC).
- Designed mining site stream relocation for maintenance of equivalent or improved biological functions; wrote permit application (MCC).
- Performed subsurface sampling and ecological surveys of dozens of difficult access waste clay impoundments (wetlands) and natural peat areas (Florida Institute of Phosphate Research and various mining and development companies.)
- Performed field engineering sampling and spillway placement design, and wrote formal abandonment reports, including biological observations and pollution mitigation designs, for five earth dam waste clay impoundments (Borden, Inc.).
- Conducted literature review of natural forested wetlands systems and wrote background information report for reclamation planning (MCC).
- Wrote technical proposal to study ecological, hydrological, and engineering aspects of forested and non-forested wetland reclamation projects by making use of typical end of phosphate mining resources. Developed reclamation project erosion mitigation techniques by re-creating natural seepage swamps and springs. (Florida Institute of Phosphate Research.)
- Wrote technical proposal to study radon gas emission from phosphate mined lands, including strategies to mitigate emanation into buildings (USEPA).
Environmental impairment liability insurance industry:
- Development of environmental impairment liability insurance programs: development of programs for insurance companies, including: development of industrial loss control standards, risk analysis, technical protocols, environmental risk analysis development, market surveys, liaison and consultation with insurance industry executives. Programs covered industrial facilities, property transfers, and underground storage tanks. Lloyds of London; Reliance Insurance Company, Philadelphia, PA; Techlaw Inc., Chantilly, VA; Environmental Risk Services, Inc., Washington, D.C, 1987-1992.
Environmental impairment liability insurance:
Field surveys and reports of findings, including risk assessments for nonsudden and sudden accidental occurrences, detailed loss control recommendations, photo documentation. Assessments of industrial facilities in the following categories: chemical manufacturers; petroleum industry; metal plating and finishing; general manufacturing; hazardous waste transfer, treatment and storage facilities; industrial waste recyclers; circuit board manufacturers; electronics manufacturing; pesticide formulators and; paint formulators; commercial research and development laboratories; printing; marine bulk liquid storage and transfer terminals; aerospace industry; pharmaceutical and cosmetics manufacturing and research; metals mining and milling; and, paper mills. American International Group, NY, NY; AIG Consultants, NY, NY; and private clients, 1983-1987. |